• Welcome to this website/forum for people interested in the Morgan 38 Sailboat. Many of our members are 'owners' of Morgan 38s, but you don't need to be an owner to Register/Join.
Joint along leading edge of rudder exposed.
svpilgrim

Joint along leading edge of rudder exposed.

Difficult to see in photo but a hairline crack runs upward from the exposed rudder shaft along the right side of the seam in the image. A similar crack runs downward from the rudder shaft as well.
There are no comments to display.

Media information

Album
Pilgrim Rudder Repairs & Modifications
Added by
svpilgrim
Date added
View count
864
Comment count
0
Rating
0.00 star(s) 0 ratings

Image metadata

Device
LGE Nexus 4
Aperture
ƒ/2.65
Focal length
4.6 mm
Exposure time
1/438 second(s)
ISO
100
Filename
2015-09-02 17.58.43.jpg
File size
2.1 MB
Date taken
Wed, 02 September 2015 5:58 PM
Dimensions
2448px x 3264px

Share this media

Back
Top