Mitchell S Allen
Active Member
Hello All,
I'm looking for any pertinant insight on this installation. I have a new Dickenson Carribean 2 burner stove to install. The stove part is pretty easy, the rest of it, I'm not real sure about. I'm also installing tile in the stove alcove before the stove goes in. The old stove left charred areas, which revealed themselves when I removed the original Alcohol stove.
I've searched the archives here and found some info. What I'm thinking is running the plumbing from the Lazerette locker, which will be the tank locker, up along the coaming forward and down at the fuel fill hose, through the cabinetry and into the stove alcove where the old alcohol feed line was.
Does this make any sense? Am I missing anything here?
I'm looking at the other parts needed too. Regulator, Solenoid, Hose, Control module/ sniffers. Thiis is really out of my experience, though I can do this type of stuff.
Let me know your thoughts and experiences please.
Thank you,
Mitchell
I'm looking for any pertinant insight on this installation. I have a new Dickenson Carribean 2 burner stove to install. The stove part is pretty easy, the rest of it, I'm not real sure about. I'm also installing tile in the stove alcove before the stove goes in. The old stove left charred areas, which revealed themselves when I removed the original Alcohol stove.
I've searched the archives here and found some info. What I'm thinking is running the plumbing from the Lazerette locker, which will be the tank locker, up along the coaming forward and down at the fuel fill hose, through the cabinetry and into the stove alcove where the old alcohol feed line was.
Does this make any sense? Am I missing anything here?
I'm looking at the other parts needed too. Regulator, Solenoid, Hose, Control module/ sniffers. Thiis is really out of my experience, though I can do this type of stuff.
Let me know your thoughts and experiences please.
Thank you,
Mitchell