Fortin024
Member
Hi all,
I'll try to keep this short. My anchor locker bulkhead had rot and I decided to redo the job. While I'm at it, I had the old style anchor locker shelves about 1 ft off the deck with two small copper drains on each side.
I decided to make use of the lower anchor locker and make a proper shelf down there with proper drains.
It rained a lot during these endeavours and a for a few days water was most likely coming in.
So I found a bit of water at the bottom of the locker that has the encapsulated lead, and when I went in there I saw this pvc pipe that runs under the lead. Could someone steer me in the right direction of what is that PVC pipe used for, and what drains through it ?
You can see attached pictures of the new anchor locker shelf I built and glassed, and the actual PVC pipe that I'm referring to.
I'll try to keep this short. My anchor locker bulkhead had rot and I decided to redo the job. While I'm at it, I had the old style anchor locker shelves about 1 ft off the deck with two small copper drains on each side.
I decided to make use of the lower anchor locker and make a proper shelf down there with proper drains.
It rained a lot during these endeavours and a for a few days water was most likely coming in.
So I found a bit of water at the bottom of the locker that has the encapsulated lead, and when I went in there I saw this pvc pipe that runs under the lead. Could someone steer me in the right direction of what is that PVC pipe used for, and what drains through it ?
You can see attached pictures of the new anchor locker shelf I built and glassed, and the actual PVC pipe that I'm referring to.